Paper Chain Budget
Turn one sheet into the longest continuous chain that survives being lifted by its two ends.

Set the scene
Give every team equal paper and tape. Define a valid chain as closed loops threaded through one another; a taped strip without loops does not count.
How to play
- Estimate a strip width and make two test loops. Lift them together to see whether they bend or tear at the joint.
- Agree on a cutting plan before using the rest of the sheet. Assign cutting, threading and closing roles, then rotate halfway through.
- Stop building after eight minutes. Two testers lift the ends gently until the middle clears the table for three seconds.
- Lay each surviving chain flat without stretching it and measure end to end. Record both length and the design choice that kept the weakest joint closed.
Host’s note
Measure all chains under the same rule. A chain pulled taut will look longer but may sacrifice exactly the strength the task is meant to test.
Try a variation
Instead of competing on length, set a target span and reward the team that meets it using the least tape.
More in this collection
TeamworkSilent Card Sort
Agree on a classification system through placements and revisions before anyone gets to explain their thinking.
TeamworkIsland Supply List
Pack for an imaginary pop-up exhibition with limited space and negotiate which visitor needs the team will cover.
TeamworkZipper Count
Reach a target number as a group when nobody knows who will speak next and overlapping voices reset the count.